  • 1. Check before starting
    ①Check whether the oil level of the oil dipstick is between \"L\" and \"H\", and whether there are any signs of abnormal oil quality.
    ②Check whether the cooling water in the water tank is sufficient, whether the water valve switch is turned on, and whether the cooling water is abnormal.
    ③Check the tension of the water pump belt, fan belt and charger belt.
    ④Check whether there is any sundries between the fan and the cooling fins of the water tank, if there is, remove it.
    ⑤Check whether there is any debris piled on the generator set and remove it.
    ⑥Check whether the generator set is leaking oil or water.
    ⑦Check whether the battery connector is loose or corroded.
    ⑧ Read the record card of unit operating parameters, whether various filters and oil have been used over time.
    Check before starting
  • 2. Check after booting
    ①Listen to whether there is abnormal noise from the diesel generator set, and stop it immediately.
    ②Check the oil pressure gauge. Under normal circumstances, the oil pressure should not be lower than 35psi under cold conditions.
    ③Check whether the frequency of the generator set, the voltage value is stable and the working condition of the charger.
    ④The above three conditions are all normal. After 10 minutes of no-load heat engine, run with load.
    ⑤ Avoid long-term operation under conditions above 80% of the rated load.
    ⑥Listen to the diesel engine for abnormal noise under load conditions, check the oil pressure, water temperature (below 92 degrees Celsius), frequency, voltage, and smoke color.
    ⑦Check whether the generator set has oil leakage, water leakage, air leakage and abnormal vibration of the generator set.
    ⑧ Check whether the temperature of the bulb shell is abnormal.
    Check after boot
Three, shutdown
① After unloading the load, the diesel engine will run for 10 minutes without load and then stop, so that the electric ball and the lubricating parts of the diesel engine can be fully cooled.
②Check whether the unit is leaking after shutdown. If it needs to be overhauled, the cooling water must be cooled 2 hours after the shutdown before the cooling can be discharged.

Tips
1. The engine oil, engine oil grid, engine filter, diesel grid, diesel filter, water grid and coolant must be replaced when the new machine works for 50 hours (run-in period). The air filter depends on the situation.
2. The second maintenance is after 250 hours of work, the oil, oil grid, engine filter, diesel grid, diesel filter, water grid and coolant must be replaced. The air filter depends on the situation. (Standby unit at least once a year)
3. After the third time, it must be maintained every 500 hours, and the oil, oil grid, engine filter, diesel grid, diesel filter, water grid and coolant must be replaced. The air filter depends on the situation. (Standby unit at least once a year)
4. Please select oil (CF15W-40) and consumables above the designated label.
5. The maintenance work can be done by professionals or by yourself according to the specifications. Please be sure to ask professionals for troubleshooting.
The power range of the diesel generator set supplied by our company is 30kw-3000kw, which can meet the specifications of ordinary, automatic, four protection, automatic switching and three remote monitoring, low noise and mobile...

Quick Links

Products Show

contact us
Address: Beijing South Road, Xinshi District, Urumqi, Xinjiang
416, Pacific Century International Center 12th Floor
Phone: 0991-3856119

Mobile: 13809953146
all rights reserved2020 Xinjiang Zhongmai Mechanical and Electrical Equipment Co., Ltd.